CIS 376 Software Engineering II
Fall 2012
Bruce R. Maxim, PhD Associate Professor Office: 233 CIS Phone: 436-9155 e-mail: bmaxim@umich.edu |
Classroom: 179 ELB Meeting Time: 11:30-1:20 MW Office Hours: 2:00-4:00 MW |
This course continues the study of software engineering begun in CIS 375. Topics covered include: personal software process, team software process, formal methods, human computer interaction, security, software architecture, software reliability, and use of CASE tools.
You will be required to complete several projects and to make both written and oral reports on this work. Your scores on the assignments and the exams will determine your grade in this course. There will be two exams and 4 to 6 graded assignments (programs, reports, presentations). The assignments will account for 60% of your grade, and the exams the remaining 40%. Late work will be penalized, as will evidence of cheating in any form.
Texts: Software Engineering by Ian Sommerville, Addison-Wesley,
2009 (required)
Software Engineering: A Practitioner’s Approach by
Roger Pressman, McGraw-Hill, 2010 (required)
PSP: A Self-Improvement Process for Software Engineers by
Watts Humphrey, Addison-Wesley, 2005 (required)
URL: www.engin.umd.umich.edu/CIS/course.des/cis376.html
Week of |
Topic |
Reading |
09-05 |
User Modeling |
P11 |
09-10 |
User Interface Styles |
P11 |
09-17 |
Usability Testing |
P11 |
09-24 |
Web Engineering and Mobile Apps
User modeling Project Due |
P7,P13,P20
P20 |
10-01 |
Accessibility Issues
Personal Software Process |
P20
PSP1-PSP7 |
10-08 |
Quality and Process Improvement
Critical Systems and Reliability |
PSP8-PSP14
S10-S11 |
10-15 |
Security and Design
Quality Assessment Due |
S12-S13
|
10-22 |
Secure Software Engineering
Exam 1 |
S14-15 |
10-29 |
Verification and Validation
Formal Methods |
S11,P17,P19
Notes,P21 |
11-05 |
Process Improvement Project Due
Computer-Aided Software Engineering |
Notes |
11-12 |
Quality Management
Measurement and Process Improvement |
S24,P23
S26,P25,P30 |
11-19 |
Component-Based Design
Legacy Systems and Software Change |
S17,P10
S9,S16 |
11-26 |
Reengineering
Formal System Specification Due |
P29 |
12-03 |
Software Architecture
Contractual Obligations and Liability |
S6,P9
Notes |
12-10 |
Exam 2 |
|
12-17 |
Project Presentations (11:30 am – 2:30 pm) |