Some construction pics...
 
  • Week Zero - Preparation

  •  
  • Week One - Excavation

  •  
  • Week Two - Footers and block

  •  
  • Week Three - Masons begin...

  •  
  • Week Four - ...and continue...

  •  
  • Week Five - ...and finish. Knock out wall

  •  
  • Week Six - Drain tile and insulation

  •  
  • Week Seven - Backfill and first floor deck

  •  
  • Week Eight - First floor deck and walls

  •  
  • Week Nine - Second floor deck and walls

  •  
  • Week Ten - Second floor walls and attic floor

  •  
  • Week Eleven - Remove and extend roof in J&M's room

  •  
  • Week Twelve - Extend attic floor forward, over bathroom

  •  
  • Week Thirteen - After tuck pointing, the new roof rises above attic floor

  •  
  • Week Fourteen - Sheathing roof and walls moves fast

  •  
  • Week Fifteen - After tuck pointing, the new roof rises above attic floor

  •  
  • Week Sixteen - The roofers arrive...

  •  
  • Week Seventeen - The windows arrive...

  •  
  • Week Eighteen - The doorways cut, bathroom gutted & holiday in FL...

  •  
  • Week Nineteen - MBK exits for the short term, attic work...

  •  
  • Week Twenty - HVAC begins...

  •  
  • Week Twenty-one - Birthday pause...

  •  
  • Week Twenty-two - refloor the old attic with 2x10s...

  •  
  • Week Twenty-three - Furnace/AC installed

  •  
  • Week Twenty-four - a bye?!...

  •  
  • Week Twenty-five - Preprimed siding arrives...

  •  
  • Week Twenty-six - Stewart & Company begin installation...

  •  
  • Week Twenty-seven - siding done, the basement floor is poured...

  •  
  • Week Twenty-eight - Electric wires pulled...

  •  
  • Week Twenty-nine - Copper roof built, installed...

  •  
  • Week Thirty -pause?...