South and East walls get put up. Note 12" drop in elevation from main level to new nook, level with vestibule.

Moving on up to the second floor, we see the floor joists, and the beginnings of the deck. Matthew's balcony door is framed in, and the West wall gets built and positioned.

The balcony has finished wreaking its water damage; the railing is cut away.