Tub and tile are removed and the new subfloor is installed. The barrel ceiling and the walls on either side are framed in. Note the space between wall and shower for the steamer.

As John and Joe prepare to move on to their next job, the floors are cleaned up and the structure really becomes evident. See the old and new arches? MBK cleans up their stuff and they are gone...

I turn my attention to the kneewall in the new attic space. The recessed shelves come out so that Matt and his guys can get at the ducts and so that the insulators will have an easy access to the space behind the kneewalls. In the old attic, clearing out the old insulation for the laying of duct work. 16 foot 2x10s are for raising the floor 4", sistering them to the existing 2x6s.

Rick and Ron cut new footing in basement to carry the I-beam. J approves...