The siding gets finished, but for the front and back gables. The front is delayed because that is where the drywall will be carried through. The back is delayed because Kyle and I ahven't made the copper roof yet. Tara inspects front and sides.

The basement floor finally gets preped and poured. The cement once again comes via the mule, to the chute, to the barrow and beyond. Spreading and smoothing brought to you by Mike and Ron.