Keywords
discrete process simulation, scheduling, sequencing, material handling
Abstract
We describe the application of simulation analysis to a complex
operational problem involving scheduling, sequencing, and
material-handling decisions. The manufacturing process under study
required close attention to correct mix and sequencing of raw materials,
reduction of material-handling costs, high utilization of a resource
having significant purchase and operational expense, and a steady,
low-variance throughput.
In accordance with the copyright held by the Winter Simulation Conference Board of Directors, the complete paper is now available on this site, since the Proceedings have been published.